All the trimmings

This month has involved lots of trim and tile work. It is fun to see elements of our design start to come to life! Hayes and company have been hard at work casing all of our windows, hanging our doors, installing crown moulding, baseboards and paneling. We have also designed shelving for closets and storage. It’s amazing how many options exist for each category. We have attempted to select classic profiles and traditional finishes to achieve a timeless feel. I’ve also been working on selecting classic, neutral wall paint colors.

It has been impressive to witness the attention to detail that is required at each step. For example, I have never before thought about the effort it takes to set shiplap and layout tile. This month’s blog post will be a photo journal entry of some of our progress to record some of these special details.

window casing and doors
office hall
office bookshelf and closet
crown moulding
unlacquered brass ball bearing hinges
master closet design
custom master closet assembly
double hanging closet walls
master bath December 2018
master bath shiplap install January 2019
master bath shiplap install January 2019
master bath floor heat install February 2019
master bath tile install February 2019
master bath tile with cutout for laundry shoot
master bath tile grouted
powder room beadboard wall paneling
powder room beadboard paneling with cement hex tile install
powder room hex cement tile, terracotta inspired, grouted
Jack and Jill bathroom shower
Jack and Jill bathroom paint selections – Sherwin Willams Sea Salt
house wall color selection – Farrow & Ball Slipper Satin
cabinets are ready for install next week